{"id":209139,"date":"2021-08-31T13:06:30","date_gmt":"2021-08-31T17:06:30","guid":{"rendered":"http:\/\/www.montclair.edu\/facilities\/?p=209139"},"modified":"2024-01-24T14:36:27","modified_gmt":"2024-01-24T19:36:27","slug":"student-recreation-center-gets-an-energy-saving-upgrade","status":"publish","type":"post","link":"https:\/\/www.montclair.edu\/facilities\/2021\/08\/31\/student-recreation-center-gets-an-energy-saving-upgrade\/","title":{"rendered":"Student Recreation Center Gets an Energy Saving Upgrade"},"content":{"rendered":"
On August 29th, the Student Recreation Center received an upgrade with the replacement of 36 light fixtures. The original fixtures installed over the indoor track & basketball courts were 350W fixtures which each used eight metal-halide bulbs*<\/a>. The replacements are a combination of 150W and 60W LED fixtures.<\/p>\n The project was managed by the office of Capital Planning & Project Management<\/a> with the contractor Big Shine.<\/p>\n As a result of this project, the University will see energy savings of 36,266 kWh per year.<\/p>\nHow these savings translate:<\/h2>\n

\n