{"id":4142,"date":"2023-10-18T08:11:40","date_gmt":"2023-10-18T12:11:40","guid":{"rendered":"https:\/\/www.montclair.edu\/library\/?p=4142"},"modified":"2023-10-18T08:12:34","modified_gmt":"2023-10-18T12:12:34","slug":"sprague-library-is-getting-a-new-roof","status":"publish","type":"post","link":"https:\/\/www.montclair.edu\/library\/2023\/10\/18\/sprague-library-is-getting-a-new-roof\/","title":{"rendered":"Sprague Library is Getting a New Roof!"},"content":{"rendered":"
Why is there a fence outside the library? Because Sprague is getting a new roof! The fenced area will be used to stage construction materials and dumpsters. The library remains open and hours<\/a> will stay the same.<\/p>\n During the project, we anticipate that the work will be most audible on the second floor. Library users are encouraged to seek out study spaces<\/a> on the first floor<\/a> and lower level<\/a> for more quiet.\u00a0 You can always ask at the front desk about the best places to study during this period.<\/p>\n We are excited about this project as it will help to improve environmental conditions (no more leaks) and protect the library’s long-term sustainability.<\/p>\n