{"id":5380,"date":"2024-04-12T13:01:08","date_gmt":"2024-04-12T17:01:08","guid":{"rendered":"https:\/\/www.montclair.edu\/library\/?p=5380"},"modified":"2024-06-24T09:28:25","modified_gmt":"2024-06-24T13:28:25","slug":"starbucks-construction-where-to-study-in-the-library","status":"publish","type":"post","link":"https:\/\/www.montclair.edu\/library\/2024\/04\/12\/starbucks-construction-where-to-study-in-the-library\/","title":{"rendered":"Starbucks Construction – Where to Study in the Library"},"content":{"rendered":"
Construction to renovate the former Cafe Diem space on the first floor of Sprague Library is expected to begin on April 22, 2024 and to be completed by the first week in August, in preparation for the opening of a new Starbucks location.<\/p>\n
Outdoor tables will be relocated further from the building. While there is going to be an increase in the noise level, we wanted to remind you that there are plenty of quiet locations<\/a> within the library to continue your studies. Here are our Top 5 Picks<\/strong>:<\/p>\n\n
<\/figure><\/li>\n
<\/figure><\/li>\n
<\/figure><\/li>\n
<\/figure><\/li>\n
<\/figure><\/li>\n<\/ol>\n
\n